This is Addendum No. 1 to the City of South Padre Island’s Request for Qualifications (RFQ 2024‑SL01) for professional services to design, oversee construction, and manage mitigation for the new Wind & Water Sports Venue. The addendum answers four public questions, revises the RFQ to require firms to detail recent USACE permit successes (worth 25 points), and supplies updated mitigation documents, including the 10‑acre off‑site wetland mitigation plan that will offset the 1.58 acre wetland loss at the venue.
| Addendum issuance date | 5 June 2024 |
| Wetlands impacted at venue | 1.58 acres total (0.41 acre salt marsh, 0.04 acre brackish marsh, 1.13 acre tidal algal flat) |
| Off‑site mitigation site size | 10 acres |
| Properties evaluated for mitigation | 28 |
| Properties excluded (upland) | 7 |
| Points assigned to USACE permit experience | 25 points |
| Wood bollard dimensions | 10 inches diameter, 3 feet high; rope 1 inch diameter |
| Signage spacing around mitigation site | Every 60 feet (every third bollard) |