curlyphries
Pa Mi Gente Español
Public notice

Public Notice: Neptune Circle Beach Access Irrigation & Landscape Plans

original file: Beach Access #16 Neptune Circle Improvements - Sealed Drawings 2024-08-09
South Padre Island

Open the original document

AI-generated summary — always verify against the original document above.

What is this?

This public notice provides the sealed engineering drawings and technical specifications for the Neptune Circle beach‑access improvement project on South Padre Island. It details the irrigation system (pipes, valves, controllers, backflow preventer, drip and rotor layout), landscape planting, concrete hard‑scape, and related construction requirements, including material standards, dimensions, and warranty/maintenance periods.

Key figures

Drawing date 2024‑08‑09
Landscape plan date 2022‑04‑22
Design pressure 60 psi
Minimum static pressure to start work 50 psi
Irrigation system warranty period 1 año
Temporary irrigation (dune restoration) period 90 días
Main‑line valve spacing 200 pies
Concrete compressive strength requirement 2,500‑3,000 psi
Generated by gpt-oss:120b